Dance Education Center, Stevens Point, WI
Dressing rooms and a retail area
We were fortunate to be involved in this wonderful project for the community. It was a fast track project and included three dressing rooms as well as a retail area.
Altmann Construction utilized various exterior finishing material: EIFS (exterior finished system), burnished block (ground, polished and sealed concrete block that has an almost granite look to it), and corrugated metal siding. Suspension floors were installed in three dance studios and bamboo, ceramic and carpet flooring were utilized throughout the facility.
Architect
Square Footage
Shulfer Architects, LLC
5,988
NOTE: Construction on this fast track project began in the middle of winter and was completed in three phases, with the Dance Education Center first, then Les’ Upholstery and finally Precision Cellular & Sound. The result was the Sunset Plaza in Stevens Point.
All three businesses reside adjacent to each other. Les’ owned the original property and building in which Les’ and DEC resided. Altmann Construction performed the site work for all three buildings.
Locating and staging all three buildings was a challenge as the site was extremely tight. By the request of the Village of Park Ridge, a storm water filtration system was designed and constructed onsite as it will accept all of the storm water runoff for all three buildings.
The exterior was completed in EIFS and cement board siding. As an added bonus, the asphalt from the original parking lot was recycled and reused as road base for all three parking lots.